PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued installing duct hangers at the 2nd Floor Facing North-East (800x600).jpg Finished installing the piping for the water tie in at Rahway Ave. (800x600).jpg Installed metal decking at Derrick -5 (Roof) Facing East (800x600).jpg Started repairing the inside Stairwell -2 (800x600).jpg Welding tube steels at the Skylight Facing South (800x600).jpg
Previous pageNext page Finished installing the piping for the water tie in at Rahway Ave. (800x600)
Finished installing the piping for the water tie in at Rahway Ave. (800x600)